The Beijing-Shijiazhuang Passenger Dedicated Line, also known as the Beijing-Shijiazhuang high speed rail, runs from the Beijing West Railway Station in the north, passes by Zhuozhou, Gaobeidian, Baoding, Dingzhou, Shijiazhuang Airport and reaches to Shijiazhuang New Passenger Station with a total length of 281 km. 7 stations are set including Bejing West, New Zhouzhuo, New Gaobeidian, Baoding East, New Dingzhou, Shijiazhuang Airport, Shijiazhuang New Station. Designed speed is 350 km per hour.

---

Beijing-Shijiazhuang High-Speed Rail Importing the passenger information service system and fare collection system of Beijing West Railway Station includes: the project scope consists of elevated waiting room reconstruction, passenger service system reconstruction, the additional VIP waiting room and transfer facilities for South Station room, joint section reconstruction between North Square and South Square. This project involves a total construction area of about 45,000 square meters, of which: about 37,000 square meters (about 7700 square meters of new part) of elevated floor; about 7100 square meters underground; additional about 900 square meters waiting area for VIP of South Station. The passenger service system of Beijing West Railway Station includes passenger service system and ticketing system. The integrated platform newly added and the existing integrated display system, broadcasting system, video monitoring system, self-service query system, and clock system reconstructed for this project. The security check instrument maintained as current status. Ticketing system will access to the Beijing Bureau ticketing center system as the station level ticketing system.